Energy

Candidate Storage Type Hydroelectric Power Project

 

Project Name Type Installed Capacity (MW) Annual Energy (GWh) Project Cost (MUS$)* The earliest commissioning Year (FY)
Dudh Koshi STO 300 1909.6 1141 2023/24
Nalsyau Gad STO 410 1406.1 966.9 2023/24
Andhi Khola STO 180 648.7 665.8 2025/26
Chera-1 STO 148.7 563.2 576.9 2027/28
Madi STO 199.8 621.1 637.3 2017/28
Naumure STO 245 1157.5 954.5 2027/28
Sun Koshi No. 3 STO 536 1883.6 1690.5 2028/29
Lower Badigad STO 380.3 1366 1209.8 2028/29
*2012/13 Price
Source: Nationwide Master Plan Study on Storage-type Hydroelectric Power Development in Nepal